Sunday, 5 May 2013

Post processing steps for SAP BW system copy or db copy

After system copy, you nees to perform some post action to reactivate the extractors
Usually, to have the data sorted, you refresh both the source and target system.

If you run the refresh only the BW system, you can ignore the first paragraph

Action in souce system
  • scc4
modificare il nome logico
  • sm59
check that it exists and functions, the RFC connection BATCLNT100
  • we21
check that there is a door that points to BATCLNT100 (ex change the port A0000000XX that points to the system ofproduction BW)
  • sale
create new logical system BATCLNT100 (note the system must be open to change in order to change the table)
  • we20
create new logical system BATCLNT100 like LS type, you must reset all flags of BAPCLNT100. So the most 'safe is to create it as a copy of BAPCLNT100 (the "No Partner" is the logical system, not the RFC connection!). After that inOutbound parmtrs, click twice on the message t ype, the screen will open with the parameters configured, check that the door is the same as previously configured in WE21.
Check that in Classification , patner status is active ( A - active , I - inactive).



ScreenHunter_20 May. 03 11.20.jpg
ScreenHunter_20 May. 03 11.21.jpg

ScreenHunter_21 May. 03 11.21.jpg




Action in bw system
  • BDLS


converts occurrences of the value for logical system name in various tables.


Convert BAPCLNT100 in BATCLNT100

Convert <LOGICALNAMESOURCE_PROD>in <LOGICALNAMESOURCE_TEST>

Do not continue until both the logical names have not been converted



  • SE16

Check the entry in follow table; should relate to the test

RSLOGSYSDEST

RSBASIDOC
  • se37


Function: RSAP_BIW_DISCONNECT

Parameter   I_BIW_LOGSYS                  <<SLOGSYS>>
                      I_OLTP_LOGSYS                <<RLOGSYS>>
                      I_FORCE_DELETE              X

  • we21
check that there is a door that points to BATCLNT100 (ex change the port A0000000XX that points to the system ofproduction BW)
  • sale
create new logical system BATCLNT100 (note the system must be open to change in order to change the table)
  • we20
create new logical system BATCLNT100 like LS type, you must reset all flags of BAPCLNT100. So the most 'safe is to create it as a copy of BAPCLNT100 (the "No Partner" is the logical system, not the RFC connection!). After that inOutbound parmtrs, click twice on the message t ype, the screen will open with the parameters configured, check that the door is the same as previously configured in WE21.
Check that in Classification , patner status is active ( A - active , I - inactive).

  • rsa1
    ScreenHunter_21 May. 03 11.38.jpg
     ScreenHunter_22 May. 03 11.38.jpgright --> restore
     ScreenHunter_23 May. 03 11.39.jpgUser administrator
    ScreenHunter_24 May. 03 11.39.jpgcontinue

     ScreenHunter_25 May. 03 11.39.jpgUse
also replicate
Dialog
execute evaluation

No comments:

Post a Comment